MCOG Reports and Projects

Gualala
Community Action Plan and
Downtown Design Plan

July 10, 2012: The Downtown Gualala Preliminary Project Study Report - Refined Streetscape Design Plan is now complete.

Entire Report as single file with Appendices
70 MB

Cover

2 MB

Body of Report

23MB

Appendix A - Refined Downtown Gualala Streetscape Design Plan

10 MB

Appendix B - Summary of Comments & Responses, March 2012

7 MB

Appendix C - Intersection Level of Service Calculations

28 MB

In December 2011, MCOG amended into its annual transportation planning program "Gualala Downtown Plan Implementation," continuing the work described below. Executive Director Phil Dow has worked closely with the community and consultant RRM Design Group "to pursue implementation of recommended improvements in the Community Action Plan, Phases 1 and 2."

Press Release: A public meeting has been set to receive public input on a proposed refinement to the Streetscape Plan component of the Gualala Downtown Design Plan. It will be held at the Gualala Community Center, 47950 Center Street, Gualala, on Saturday, March 10 from 11:00 a.m. to 1:00 p.m. ... Those unable to attend the meeting will be able to review the displays and a summary of the proposed changes [see "New Documents" below]. Comments on the plan refinements should be directed to Phil Dow at dowp@dow-associates.com by March 23, 2012. Read more

3/9/2012 New Documents for Review: Streetscape Design


(250 to 500 KB per sheet)

The second phase of this project, in MCOG's Fiscal Year 2007/08 and 2008/09 Planning Work Programs, is complete. With community participation, a Downtown Design Plan was produced, including streetscape, parking and circulation elements. The final plan was accepted by MCOG's Board of Directors in a public hearing on March 2, 2009. It was recognized that some issues remained to be resolved, notably parking.

The work was funded by MCOG and Caltrans through two Community Based Transportation Planning grants. The first phase of the project was completed in MCOG's Fiscal Year 2005/06 and 2006/07 Planning Work Programs. A Community Action Plan was produced as a result.

Both plans were designed to be consistent with other local plans and community input. Workshops were conducted in 2006 and 2008, and additional public meetings were held thoughout the process. RRM Design Group worked closely with stakeholders to develop the plans.

Gualala Downtown Design Plan (single file with appendices) - 3/3/2009 (15 MB)

Downtown Design Plan by section:

Cover  
Acknowledgements & Contents Appendices:
Chapter 1 - Project Overview A - Streetscape Concepts
Ch. 2 - Circulation Plan B - Streetscape Amenities
Ch. 3 - Streetscape Design C - Master Plan Budget
Ch. 4 - Parking Plan D - Publicity & Outreach
Ch. 5 - Implementation E - Workshop Results

Gualala Community Action Plan (single file without appendices) - 3/28/2007 (1.6 MB)

Community Action Plan appendices:

A - Improvement Program Diagram F - First Public Workshop
B - Existing Conditions Report F - Second Public Workshop
C - Base Traffic Conditions Report H - Comments on Draft Plan
D - Draft Economic Inputs Report H - MCOG Public Hearing
E - Publicity and Outreach Strategy H - Board of Supervisors Minutes

Documentation of the Phase I planning process:

Key Stakeholder Summary 4/28/2006 Workshop 1 Design Charette 4/29/2006
Workshop 1 Walking Tour Summary 4/28/2006 Workshop 2 Options & Ideas 6/14/2006
Workshop 1 Priorities Summary 4/29/2006 Workshop 2 Report Card 6/14/2006
Workshop 1 Visual Preferences 4/29/2006 Options & Ideas Report 6/2006

Public Hearing: the Draft Community Action Plan document was presented to MCOG's Board of Directors, in a public hearing held on location at Gualala Community Center on November 6, 2006. MCOG accepted the document as written, and all public comments from the hearing were added (refer to Appendix H).

A final presentation was made by Mr. Keith Gurnee of RRM Design Group to the County of Mendocino Board of Supervisors on Tuesday, January 9, 2007.

For more information about the project, contact: Phil Dow at MCOG, 463-1859

For more information about Gualala, see Gualala Municipal Advisory Council's website: www.gualalamac.com

For more information about grants: Caltrans Transportation Planning Grant Program